EV OASIS
at NEVADA Electric Highway

VERDEK participated in the Nevada Electric Highway (NEH), enhancing EV charging infrastructure along key highways. Awarded by NV Energy, Verdek led the installation of DC fast and Level 2 chargers from June 2020 to December 2021, resulting in 8 operationa

Nevada Electric Highway
Nevada Electric Highway Map

VERDEK is a Proud Participant of this Mega Project

The Nevada Electric Highway (NEH) was initiated as a collaborative effort between the Governor's Office of Energy (GOE) and NV Energy to magnify the state electric vehicle (EV) charging infrastructure.

The objective was to expand the expansion of EV charging infrastructure along the state remaining significant interstate and highway corridors: I-15, I-80, U.S. 93, U.S. 50, and the rest of U.S. 95.

NV Energy awarded Verdek as the project leader in the installations of DC fast chargers and Level 2 along I-15, U.S. 95. The project started in June 2020 and was completed in December 2021. There are now 8 sites that Verdek owns and operates.

Nevada Electric Highway Installation
Nevada Electric Highway Charging Station